A crane lowers a white sail drone into a harbour at dawn while two technicians steady it

Two hundred days at sea, no crew

Sail drones for the Mediterranean, built in Sardinia

Explore the platform

Dual use · Data as a service

A sail drone under a granite coast in low light, seen from the water

The story

How it stays out there

Twenty seconds on what makes two hundred days possible.

Scroll

01 / 06Launch

It leaves on its own

Lifted in by crane, released, gone. From then on the mission runs from a screen.

The sail drone sailing away from a rocky coast at golden hour

02 / 06Wind and sun

Nothing to refuel

A rigid wing sail moves it, solar panels feed the sensors. Endurance ends with fouling, not with fuel.

The rigid wing sail against the low sun, the sensor mast on deck

03 / 06The hull

Composite, built in Assemini

Carbon and epoxy from a yard that builds racing structures, light enough to sail in a breath of wind.

The white bow cutting through flat water

04 / 06Below the waterline

It listens

Hydrophones on the keel and a quiet hull above them. Acoustic monitoring is the payload it was designed around.

The keel pod seen from under water, sunlight rays on the sandy seabed

05 / 06The fleet

One drone is a sensor, a fleet is a picture

Vessels hold station or move as a line. The control room reads them as one instrument.

Three sail drones in formation near the coast

06 / 06The service

You buy sea days, not hulls

The fleet stays ours. You receive the data, from a single day to a season.

A dozen sail drones at anchor at sunset, seen from above
01
LOG 01/0639°07'N 9°31'EDay 001LOG 02/0639°27'N 9°48'EDay 012LOG 03/0640°12'N 10°06'EDay 041LOG 04/0641°18'N 9°18'EDay 096LOG 05/0638°54'N 8°42'EDay 158LOG 06/0639°13'N 9°07'EDay 200

The position of every vessel.

The sound of the seabed.

The state of a pipeline.

Two hundred days without coming home.

  • The sail drone at sea with a frigate on the horizon Maritime awareness
  • The keel and its sensors under water Acoustics
  • The sail drone under the legs of an offshore platform Offshore assets
  • The fleet at anchor at sunset The fleet

One platform, three lines of work: public bodies and the environment, defence, energy. The same hull with a different payload.

The platform

Maistrale, a sail drone for the Mediterranean

Six metres and eight of composite hull under a rigid wing, with the sensors below the waterline and the links on the mast.

The Maistrale sail drone in profile against the low sun, wing sail up PR-M1 · Render
  • Wind for propulsionA rigid wing sail, trimmed by the autopilot. No engine hours, no fuel on board.
  • Sun for the sensorsDeck solar panels and a battery bank sized for the Mediterranean winter.
  • Acoustic firstHydrophones on the keel pod and a hull with nothing that hums. Built for listening.
  • Three linksSatellite, LTE near the coast, VHF and AIS. The control room is never out of reach.
  • Racing compositesCarbon and epoxy laminated in Assemini, in the yard that builds racing structures.
  • Swappable payloadFour configurations on the same hull. The payload bay changes in a morning.

Key figures

Length
6.8 m
Wing height
4.6 m
Endurance
200 days
Cruise speed
2.5 kn
Payload
45 kg
Links
SAT · LTE · VHF

Figures are design targets for the first series. They will be confirmed at sea trials.

Where

The Mediterranean in two hundred days

Eight example missions from the base in Cagliari, one per kind of customer. None has been flown yet: the first hulls are in build.

Show missions of one line
Base

The plan

Eight missions, one base

Pick a point on the chart or a line in the list. Every mission leaves from Cagliari and comes back when its sea days are done.

Base
Cagliari
Example missions
8
Sea days planned
680

Example mission, not yet flown

  • Pelagos cetacean censusLigurian Sea, Pelagos Sanctuary90 days
  • Bonifacio strait watchStrait of Bonifacio60 days
  • Capo Carbonara posidoniaGulf of Cagliari45 days
  • Sicily Channel awarenessStrait of Sicily120 days
  • Ionian acoustic picketGulf of Taranto150 days
  • Adriatic platform surveyNorthern Adriatic, off Ravenna40 days
  • Oristano wind site surveyWest of Sardinia100 days
  • Malta seabed surveySouth of Malta75 days

Missions are examples of what the fleet is designed to do. Places are real, the missions are not yet flown.

How it works

From a request to a dataset

You do not buy a drone. You buy the days it spends at sea and what it brings back.

  1. 01

    Brief

    Area, duration, what you need to know. We size the payload and the number of hulls.

    One week
  2. 02

    Launch

    By crane from a quay or from our yard at Cagliari. A drone is at sea within a day of leaving the truck.

    One day
  3. 03

    Watch

    The control room plans, monitors and re-routes. You see the same picture on your screen.

    Every day at sea
  4. 04

    Deliver

    Data streams during the mission and lands as a dataset at the end, in your format.

    Continuous
A carbon fibre hull section on the bench in the Assemini workshop, a laser line along its axisAssemini, Sardinia

The yard

Built where racing boats are built

Pedra Rubja is a composites yard first. Clean room, autoclave, five-axis milling and a team that laminates carbon for racing programmes.

The drone is built with the same processes, in the same hangar. That is why the hull is light, why spare parts exist, and why a repair does not wait for a supplier.

In numbers

What a mission is made of

200
days at sea per mission, design target
0
litres of fuel on board
45 kg
of payload, swappable in a morning
4
configurations on the same hull

Design targets for the first series. Sea trials will confirm them.

Investors

A fleet is being built. So is the round.

A Sardinian yard with racing composites, a sailor at the helm, and a Mediterranean that nobody watches from the water for more than a day. The case, the roadmap and the ask, on one page.